Alishan Forest Railway - Biblioteka.sk

Upozornenie: Prezeranie týchto stránok je určené len pre návštevníkov nad 18 rokov!
Zásady ochrany osobných údajov.
Používaním tohto webu súhlasíte s uchovávaním cookies, ktoré slúžia na poskytovanie služieb, nastavenie reklám a analýzu návštevnosti. OK, súhlasím


Panta Rhei Doprava Zadarmo
...
...


A | B | C | D | E | F | G | H | CH | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

Alishan Forest Railway
 ...

Alishan Forest Railway
Overview
LocaleChiayi County, Taiwan
Coordinates23°30′36″N 120°48′15″E / 23.510092°N 120.804239°E / 23.510092; 120.804239
Termini
Connecting linesChiayi Station: TRA Western Line
Stations22
WebsiteOfficial website Edit this at Wikidata
Service
Operator(s)Forestry and Nature Conservation Agency
Daily ridership5,500[1]
History
Opened1912 (1912)
Technical
Line length86 km (53 mi)
Track gauge762 mm (2 ft 6 in)
Highest elevation2,216 m (7,270 ft)
Route map

Chiayi Taiwan Railways Administration
Beimen
Lumachan
Zhuqi
Mululiao
Zhangnaoliao
Dulishan
Liyuanliao
Jiaoliping
Shueisheliao
Fenqihu
Duolin
Shizilu
Pingzhena
First Reverse
Second Reverse
Erwanping
Shenmu
Alishan
Shuishan
Zhaoping
Chushan
Duigaoyue
Tashan
Mianyue
Shihou
Alishan Forest Railway
Traditional Chinese阿里山森林鐵路
Simplified Chinese阿里山森林铁路

Alishan Forest Railway (Chinese: 阿里山森林鐵路; pinyin: Ālǐshān Sēnlín Tiělù; Pe̍h-ōe-jī: A-lí-san Sim-lîm Thih-lō͘) is an 86 km network of 2 ft 6 in (762 mm) narrow gauge railways running up to and throughout the popular mountain resort of Alishan in Chiayi County, Taiwan. The railway, originally constructed for logging, has become a tourist attraction with its rare Z-shaped switchbacks, and over 50 tunnels and 77 wooden bridges.[2] Taiwan's Ministry of Culture has listed the forest railway as a potential World Heritage Site.[3]

Alishan Forestry Railway and Cultural Assets Management Office AFRCHO [4]

History

Japanese era

Class B 28t Shay locomotive No.31

The narrow gauge lines were originally constructed by the Japanese Colonial Government to facilitate the logging of cypress and Taiwania wood.[5] Preliminary surveying was conducted in 1900 and route planning began in 1903, but the project was shelved in 1904 due to the Russo-Japanese War. In 1906, the Japanese Government contracted the Osaka-based Fujita-gumi to build the railroad. The company laid tracks from Kagi (Chiayi) to Rienryō (Liyuanliao) and imported 13-ton Shay locomotives to run on the tracks, but financial troubles and technical difficulties in construction in the mountainous terrain forced them to abandon the project in 1908. In 1910, the Japanese Government took interest in the abandoned railroad and decided to finish it themselves, also importing 18-ton Shays for the job. The tracks were extended to Alisan (Zhaoping) in 1913, marking the completion of the main line.[6]

The Alishan Forest Railway became a major tourist railway when the tracks were extended to Niitakaguchi (新高口) in 1933. The station was located very close to Mount Niitaka (now Yu Shan), the highest mountain in Taiwan and the Japanese Empire, and the hike to the summit could be completed in seven to eleven hours, depending on the health of the individual. To cater to hikers, the railway operated an express service from Kagi to Niitakaguchi that only stopped at Shōhei; hikers would stay overnight at a lodge at Niitakaguchi and summit the next day.[7][8]

Since 1945

Diesel railcars supplemented the steam engines on the passenger services. In the 1980s, 10 Hitachi-built diesel-hydraulic locomotives were delivered and replaced the railcars and remaining steam engines.

The completion of the Alishan Highway in 1982 led to the loss of many rail passengers to faster and cheaper buses and the rail became primarily a tourist attraction.[2]

Accidents on the line have resulted in a number of fatalities over the years. On 24 April 1981, a collapsed tunnel resulted in nine deaths and 13 injuries. On 1 March 2003, 17 people were killed and 156 injured when a train derailed near Alishan Railway Station.[9] On 27 April 2011, five tourists, including three from mainland China, were killed and 113 people injured in a derailment.[10]

A damaged portion of the Alishan Line visible from Alishan National Scenic Area.

In addition, services have been repeatedly disrupted due to damages from landslides. The main line from Chiayi to Alishan has been partially closed since 2009 due to damages cause by landslides during Typhoon Morakot in 2009 and Typhoon Dujuan (2015). The line is undergoing repairs and was expected to be fully opened in 2023 [11] later revised to July 2024.[12] In August 2015, the Chiayi-Fenqihu section was briefly closed due to damages during Typhoon Soudelor.[13]

In order to further boost tourism in the region, on 5 December 2018 the Alishan Forest Railway commenced a "sister railway" partnership with Čierny Hron Railway in Slovakia;[14] the Alishan Forest Railway has since partnered with nine other companies across five different countries.[15]

Operation

The railway was privatized through a build-operate-transfer (BOT) in June 2008[16] and maintained by the Hungtu Alishan International Development Corporation.[17] On 1 May 2013, the management of the railway was taken over by Taiwan Railways Administration. On 1 July 2018, the railway was taken over by the newly established Alishan Forest Railway and Cultural Heritage Office of the Forestry Bureau.[18]

The system is currently operated using diesel locomotives, although there are occasional special public runs using the old steam powered Shay locomotives.[19]

Lines

Spiral loop in the Alishan Line at Dulishan
Alishan Station

The main line originally ran from the city of Chiayi (elevation 30 m), to Alishan (elevation 2,216 m), but is currently partially closed past Shizilu. The vegetation along the way changes from tropical to temperate and finally alpine. The line features many switchbacks on the way up the mountain.[20]

  • Main line
ChiayiShizilu
Includes several steep gradients (max. 6.26%), a spiral and four switchbacks, known as the Dulishan Spiral. The longest line with most dramatic climate change.
Reopened between Chiayi and Fenqihu (approximately the halfway point) following typhoon damage repairs in January 2014,[21] and to Shizilu in 2017.
The full remaining main line between Chiayi and Zhushan is expected to reopen on 1st [22] July 2024, after the completion of Tunnel 42 in April 2024 [23] [24]
  • Shenmu line
Alishan–First Reverse via Shenmu
Runs frequently all day, a short (5-minute) ride downhill to Shenmu station.
  • Chushan line
Alishan–Chushan
Early morning trains, popular for viewing the sunrise over Jade Mountain
  • Zhaoping line
Alishan–Zhaoping
Runs frequently all day, a short (5-minute) ride uphill to Zhaoping station
  • Mianyue line
Alishan–Shihou
Closed due to earthquake damage and typhoon, currently turned to mountain trail, reconstruction plans under discussion.
  • Shuishan line
Alishan–Shuishan
No passenger service, mountain trail and thinning only

List of stations

Alishan line (Main line)

Name Chinese Taiwanese Hakka Tsou Elevation
(m)
Distance
(km)
Transfers and Notes Location
Chiayi 嘉義 Ka-gī Kâ-ngi 30 0.0 Taiwan Railways Administration West Coast line: Chiayi West Chiayi
Beimen 北門 Pak-mn̂g Pet-mùn 31 1.6 East
Lumachan 鹿麻產 Lo̍k-môa-sán Lu̍k-mà-sán 82 10.8 Zhuqi Chiayi
County
Zhuqi 竹崎 Tek-kiā Chuk-khì 127 14.2
Mulüliao 木履寮 Ba̍k-kia̍h-liàu Muk-kiak-liàu 324 18.9
Zhangnaoliao 樟腦寮 Chiuⁿ-ló͘-liâu Chông-nó-liàu 543 23.3
Dulishan 獨立山 To̍k-li̍p-soaⁿ Thu̍k-li̍p-sân 743 27.4
Liyuanliao 梨園寮 Lê-hn̂g-liâu Lài-yèn-liàu 905 31.4 Meishan
Jiaoliping 交力坪 Ka-le̍k-pêⁿ Kâu-li̍t-phiàng 997 34.9 Zhuqi
Shuisheliao 水社寮 Chúi-siā-liâu Súi-sa-liàu 1,186 40.5
Fenqihu 奮起湖 Pùn-ki-ô͘ Fun-hí-fù 1,403 45.8
Duolin 多林 To-lîm Tô-lìm Ngungutu 1,516 50.9 Alishan
Shizilu 十字路 Si̍p-jī-lō͘ Sṳ̍p-sṳ-lu Sʉa’fʉnʉ 1,534 55.3
Pingzhena 屏遮那 Hè-sen-ná Phìn-châ-nâ Heesiana 1,711 60.5
First Switch 第一分道 Tē-it-pun-tō Thi-yit-fûn-tho 1,827 63.0
Erwanping 二萬坪 Jī-bān-pêⁿ Ngi-van-phìn Hehesiana 2,000 66.8
Shenmu 神木 Sîn-bo̍k Sṳ̀n-muk Ak’e fahei 2,138 69.6 → Shenmu line
Alishan 阿里山 A-lí-san Â-lî-sân Psoseongana 2,216 71.4
Zhaoping 沼平 Chau-pêng Cheu-phiàng Chuchumuana 2,274 72.7 → Mianyue line
→ Chushan line

Chushan line

Zdroj:https://en.wikipedia.org?pojem=Alishan_Forest_Railway
Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok. Podrobnejšie informácie nájdete na stránke Podmienky použitia.






Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok.
Podrobnejšie informácie nájdete na stránke Podmienky použitia.

Your browser doesn’t support the object tag.

www.astronomia.sk | www.biologia.sk | www.botanika.sk | www.dejiny.sk | www.economy.sk | www.elektrotechnika.sk | www.estetika.sk | www.farmakologia.sk | www.filozofia.sk | Fyzika | www.futurologia.sk | www.genetika.sk | www.chemia.sk | www.lingvistika.sk | www.politologia.sk | www.psychologia.sk | www.sexuologia.sk | www.sociologia.sk | www.veda.sk I www.zoologia.sk


Name Chinese Taiwanese Hakka Tsou Elevation
(m)