Sultan Mahmud Badaruddin II International Airport LRT station - Biblioteka.sk

Upozornenie: Prezeranie týchto stránok je určené len pre návštevníkov nad 18 rokov!
Zásady ochrany osobných údajov.
Používaním tohto webu súhlasíte s uchovávaním cookies, ktoré slúžia na poskytovanie služieb, nastavenie reklám a analýzu návštevnosti. OK, súhlasím


Panta Rhei Doprava Zadarmo
...
...


A | B | C | D | E | F | G | H | CH | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

Sultan Mahmud Badaruddin II International Airport LRT station
 ...
P01
Sultan Mahmud Badaruddin II International Airport
Palembang LRT station
A train arriving at Sultan Mahmud Badaruddin II International Airport Station, Photo was taken on 12 August 2018 (2018-08-12)
General information
Other namesSMB II International Airport Station
LocationJl. Bandara Sultan Mahmud Badaruddin II, Talang Betutu, Sukarame, Palembang
South Sumatra
Indonesia
Coordinates2°53′39″S 104°42′20″E / 2.894095°S 104.705593°E / -2.894095; 104.705593
Owned byKereta Api Indonesia
Operated byKereta Api Indonesia
Line(s) Line 1
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
ParkingAvailable
Bicycle facilitiesNone
AccessibleAvailable
Other information
Station codeBDR
IATA codePLM
History
Opened23 July 2018 (2018-07-23) trial [1]
1 August 2018 (2018-08-01) full [2]
Services
Preceding station   Palembang LRT   Following station
Terminus   Line 1   Asrama Haji
towards DJKA
Location
 SMB II International Airport Station  is located in Palembang
 SMB II International Airport Station 
 SMB II International Airport Station 
Location in Palembang

Sultan Mahmud Badaruddin II International Airport Station or SMB II International Airport Station is a station of the Palembang LRT Line 1 in Indonesia. It is located within the airport complex.

The station is one of six that opened at the Palembang LRT launch on 1 August 2018.[2]

Station layout

2F
Platforms
Side platform, doors will open on the right
Platform 1 LRT Line 1 towards DJKA
Platform 2 LRT Line 1 towards DJKA
Side platform, doors will open on the right
1F Concourse Fare gates, ticket booths, station control, shops, musalla
G Street Level Parking

References

  1. ^ "LRT Palembang Mulai Beroperasi Hari Ini" (in Indonesian). Raja Adil Siregar. Retrieved 23 July 2018.[dead link]
  2. ^ a b Siemen Martin. "1 Agustus Resmi Operasi Penuh, LRT Beroperasional Mulai Pagi". Tribun Sumsel (in Indonesian). Retrieved 1 August 2018.
Zdroj:https://en.wikipedia.org?pojem=Sultan_Mahmud_Badaruddin_II_International_Airport_LRT_station
Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok. Podrobnejšie informácie nájdete na stránke Podmienky použitia.






Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok.
Podrobnejšie informácie nájdete na stránke Podmienky použitia.

Your browser doesn’t support the object tag.

www.astronomia.sk | www.biologia.sk | www.botanika.sk | www.dejiny.sk | www.economy.sk | www.elektrotechnika.sk | www.estetika.sk | www.farmakologia.sk | www.filozofia.sk | Fyzika | www.futurologia.sk | www.genetika.sk | www.chemia.sk | www.lingvistika.sk | www.politologia.sk | www.psychologia.sk | www.sexuologia.sk | www.sociologia.sk | www.veda.sk I www.zoologia.sk