Circle line (London Underground) - Biblioteka.sk

Panta Rhei Doprava Zadarmo
...
...


A | B | C | D | E | F | G | H | CH | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

Circle line (London Underground)
 ...

Circle line
A red S7 Stock train arriving at the clockwise platform at Aldgate station, with passengers waiting to board
A Circle line S7 Stock train at Aldgate
Overview
Stations36
Colour on mapCorporate Yellow (with black outline until 1990)[1]
Websitetfl.gov.uk
Service
TypeRapid transit
SystemLondon Underground
Depot(s)Hammersmith Edgware Road Depot
Rolling stockS7 Stock
Ridership141.627 million (2019)[a][2] passenger journeys
History
OpenedInfrastructure opened in stages between 1863 (161 years ago) (1863) and 1884; shown as a separate line on the Tube map from 1949
Last extension13 December 2009
Technical
Line length27 km (17 mi)
CharacterSub-surface
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
London Underground
Bakerloo
Central
Circle
District
Hammersmith & City
Jubilee
Metropolitan
Northern
Piccadilly
Victoria
Waterloo & City
London Overground
Liberty
Lioness
Mildmay
Suffragette
Weaver
Windrush
Other TfL Modes
DLR
Elizabeth line
London Trams

The Circle line is a spiral-shaped London Underground line, running from Hammersmith in the west to Edgware Road and then looping around central London back to Edgware Road. The railway is below ground in the central section and on the loop east of Paddington. Unlike London's deep-level lines, the Circle line tunnels are just below the surface and are of similar size to those on British main lines. Printed in yellow on the Tube map, the 17-mile (27 km) line serves 36 stations, including most of London's main line termini. Almost all of the route, and all the stations, are shared with one or more of the three other sub-surface lines, namely the District, Hammersmith & City and Metropolitan lines. On the Circle and Hammersmith & City lines combined, over 141 million passenger journeys were recorded in 2019.

The first section became operational in 1863 when the Metropolitan Railway opened the world's first underground line between Paddington and Farringdon with wooden carriages and steam locomotives. The same year a select committee report recommended an "inner circle" of lines connecting the London railway termini, and the Metropolitan District Railway (commonly known as the District Railway) was formed to build the southern portion of the line.

In 1871, services began between Mansion House and Moorgate via Paddington, jointly operated by the two companies. Due to conflict between the two companies it was not until October 1884 that the inner circle was completed. The line was electrified in 1905, and in 1933 the companies were amalgamated into the London Passenger Transport Board. In 1949, the Circle line appeared as a separate line for the first time on the Tube map. In 2009, the closed loop around the centre of London on the north side of the River Thames was broken at Edgware Road and extended west to become a spiral to Hammersmith.

Starting in 2015, the signalling system was upgraded as part of a programme to increase peak-hour capacity on the line. The six-car C Stock trains were replaced from 2012 to 2014 by new seven-car S Stock trains.

History

Origins

A black-and-white photograph of a railway station platform under a barrel roof. Several figures are visible, one standing wearing a top hat, a sign reads "WAIT HERE FOR THIRD CLASS".
High Street Kensington in 1892

In 1863, the Metropolitan Railway, the world's first underground railway, opened in London between Paddington and Farringdon, connecting the Great Western Railway's relatively remote terminus at Paddington with Euston and King's Cross stations and the City, London's financial district. In the same year, a select committee report recommended an "inner circle" of railway lines connecting the London termini that had been built or were under construction. In the next year, the Metropolitan District Railway (commonly known as the District Railway) was formed to build and operate a railway from South Kensington to Tower Hill. The Metropolitan western extension from a new station at Paddington to South Kensington opened in 1868. By May 1870, the District Railway had opened its line from West Brompton to Blackfriars via Gloucester Road and South Kensington, services being operated at first by the Metropolitan.[3] In 1871, the District had built a terminus at Mansion House, and on 18 November 1876 the Metropolitan opened its terminus at Aldgate.[4] Because of the conflict between the two companies, it took an Act of Parliament before further work was done on the inner circle.[5] In 1882, the Metropolitan extended its line from Aldgate to a temporary station at Tower Hill and the District completed its line to Whitechapel. On 6 October 1884, the temporary station was replaced with a joint station and the inner circle was complete.[6][7] The Metropolitan provided the clockwise, or "outer rail", trains; the District the "inner rail", or anti-clockwise.[8] Many breakdowns occurred, due to the unbalanced wear and tear inflicted upon the train and carriages caused by travelling in a single circular direction. Equally, services were further disrupted due to petty squabbles between the two rivals including an incident whereby the Metropolitan Railway forcibly removed (using three trains) the District Railway's parked carriages which had been chained to the track.[9]

Other circle routes

As well as the inner circle, other routes circumnavigated London, although these were not complete loops. From 1872, the L&NWR began an "outer circle" service from Broad Street to Mansion House via Willesden Junction and Earl's Court, diverting an earlier service that had run to Victoria; and the GWR began a "middle circle" service from Moorgate to Mansion House via Latimer Road and Earl's Court. Both of these routes were cut back to Earl's Court: the "middle circle" in 1900 and the "outer circle" in 1909. The GWR service survived as a shuttle service from the Hammersmith & City line to Addison Road, now Kensington (Olympia), until 1940.[8]

The Midland Railway briefly ran a super outer circle from St Pancras to Earl's Court from 1878 to 1880.[8] London Overground now runs services between Clapham Junction, Willesden Junction and Dalston Junction and between Dalston Junction and Clapham Junction.

Electrification

A three-quarter black-and-white photograph of a train standing at a station, showing the end carriage with windows at the end
The joint Metropolitan and District Railway experimental electric train that ran between Earl's Court and High Street Kensington in 1900

Wooden carriages were originally hauled by steam locomotives leading to smoke-filled stations and carriages, unpopular with passengers. At the start of the 20th century, the District and Metropolitan were seeing increased competition in central London from the new electric underground tube lines and trams, and conversion to electric traction was seen as the way forward.[10] Experiments were carried out on the Earl's Court to High Street Kensington section, and a jointly-owned six-carriage train began passenger service in 1900. Following this, an AC system was suggested, and this was accepted by both parties. However, the District was looking for a way to raise the finance needed and in 1901 found an investor, the American Charles Yerkes. He formed the Underground Electric Railways of London (UERL), and his experience in the United States led him to favour DC, with third-rail pick-up similar to that in use on the City & South London Railway and Central London Railway. After arbitration by the Board of Trade, the DC system was taken up, and the railways began electrifying the routes, using multiple-unit stock.[11]

The District and Metropolitan Railways bought different designs of electric multiple unit. Both had open saloons; the Metropolitan trains with gated ends, the District B Stock with sliding doors in the middle of each car.[12] When their introduction was attempted on 1 July 1905, a Metropolitan train overturned the third rail on the District Railway, requiring all Metropolitan trains to be modified before running again on the District lines. A fully electric service began on 24 September, initially with six-car trains, later reduced to four-car.[13] The Metropolitan trains were soon modified to enclose the gated end[14] and eventually to add sliding doors in the middle.[15] Trains were increased to five cars in 1918 and the Metropolitan introduced new stock in 1921, with three pairs of sliding double doors on trailer cars.[16] In 1926 the Metropolitan took over all inner circle workings except for three trains on Sundays.[17]

London Transport

A three-quarter photograph of a red train O stock with sliding doors and flared sides, leaving Barking station bound for Ealing in 1980
O Stock was used on the Circle line 1947–70. Here photographed at Barking in 1980.
The Circle line before extension to Hammersmith

On 1 July 1933, the Metropolitan and the District Railways were amalgamated with other Underground railways, tramway companies and bus operators to form the London Passenger Transport Board. Metropolitan Railway electric multiple units were refurbished in 1934 at Acton Works to become eighteen five-car trains of Circle Stock, at first painted red and cream, later painted red all over to reduce costs. These trains included first-class accommodation,[18] but this was downgraded in 1940.[19] From 1947, these were replaced by five-car trains of O and P Stock, with doors remotely operated by the guard, released by the transfer of F Stock to the Uxbridge line.[20] The 1933 London Underground Beck map shows a Metropolitan line north of High Street Kensington and Mark Lane stations and a District line south of these points.[21] On the 1947 map, the Metropolitan and District lines were shown together in the same colour[22] and two years later in 1949 the Circle line was shown separately on the map.[23]

In 1959–1960, Circle line trains were increased to six cars, the same length as those operating on the Hammersmith & City line, and the stock of the two lines was integrated with maintenance concentrated at Hammersmith depot, allowing Neasden depot to concentrate on the new A Stock.[24] Aluminium C Stock trains, with public address systems and originally unpainted, replaced these trains from 1970.[25] One person operation of the trains was proposed in 1972 but, due to conflict with the trade unions, was not introduced until 1984.[26] In 2003, the infrastructure of the Circle line was partly privatised in a public–private partnership, managed by the Metronet consortium. Metronet went into administration in 2007 and the local government body Transport for London took over responsibilities.[27]

On 7 July 2005, at about 08:50, bombs exploded on two Circle line trains. One was travelling between Liverpool Street and Aldgate and the other was at Edgware Road. The bombs killed 15 people, including the two suicide bombers.[28][29] Following the attacks, the whole of the Circle line was closed until 8 August.[30]

A day before a ban on drinking alcohol on public transport in London came into force, a party was held on 31 May 2008, mainly on the Circle line. Thousands of people attended and 17 were arrested by police due to disorderly behaviour, eventually causing several stations to be closed.[31]

Extension

Prior to 13 December 2009, Circle line trains travelled in both directions around a simple loop with 27 stations and 12.89 miles (20.75 km) of track. In 2006, there were fourteen trains in service on the line with an interval between trains of 8+12 minutes during peak hours and 8 minutes off-peak; the minimum running time around the circle off-peak was 51+12 minutes,[32] although timetabled stops at stations extended this.[b]

In December 2009, the Circle line was extended to include the Hammersmith & City route from Edgware Road to Hammersmith. Rather than continuously running around the circle, trains now travel from Hammersmith to Edgware Road, generally going around the circle once before terminating at Edgware Road, and returning via the same route; occasionally, trains may also continue clockwise through Edgware Road to additional stations. The change was made to improve reliability and increase the service frequency on the Hammersmith branch.[34]

In March 2020, following the UK government's implementation of lockdown restricting all non-essential travel, the Circle line, along with the Waterloo & City line, was suspended.[35]

Route

Map

The route of the Circle line since 13 December 2009 and the London boroughs it serves

Railway line

Circle line
Hammersmith
Hammersmith & City Line
Hammersmith depot
enlarge…
Goldhawk Road
Shepherd's Bush (MR)
Shepherd's Bush Market
White City
Wood Lane Hammersmith & City Line
Latimer Road
Ladbroke Grove
enlarge…
Westbourne Park
Royal Oak
Paddington Bakerloo Line District Line Hammersmith & City Line Elizabeth Line Heathrow Express National Rail
Bayswater
Central line (London Underground) District Line Notting Hill Gate
Edgware Road District Line Hammersmith & City Line
District Line High Street Kensington
Baker Street Bakerloo Line Hammersmith & City Line Jubilee Line Metropolitan Line
District Line Piccadilly Line Gloucester Road
District Line Piccadilly Line South Kensington
Great Portland Street
Euston Square Hammersmith & City Line Metropolitan Line
Sloane Square
enlarge…
King's Cross St Pancras
Hammersmith & City Line Metropolitan Line Northern Line
Piccadilly Line Victoria Line
National Rail
Eurostar
National Rail District Line Victoria Line Victoria
St James's Park
London River Services District Line Jubilee Line Westminster
Clerkenwell not built
London River Services Bakerloo Line District Line Northern Line Embankment
Temple
Farringdon Hammersmith & City Line Metropolitan Line Elizabeth Line National Rail
National Rail London River Services District Line Blackfriars
Mansion House
Barbican Elizabeth Line
National Rail District Line Cannon Street
Docklands Light Railway Central line (London Underground) District Line Northern Line Waterloo & City Line Monument
Moorgate Hammersmith & City Line Metropolitan Line Northern Line Elizabeth Line National Rail
Liverpool Street Central line (London Underground) Hammersmith & City Line Metropolitan Line Elizabeth Line Lea Valley lines National Rail
London River Services District Line Tower Hill
Zdroj:https://en.wikipedia.org?pojem=Circle_line_(London_Underground)
Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok. Podrobnejšie informácie nájdete na stránke Podmienky použitia.






Text je dostupný za podmienok Creative Commons Attribution/Share-Alike License 3.0 Unported; prípadne za ďalších podmienok.
Podrobnejšie informácie nájdete na stránke Podmienky použitia.

Your browser doesn’t support the object tag.

www.astronomia.sk | www.biologia.sk | www.botanika.sk | www.dejiny.sk | www.economy.sk | www.elektrotechnika.sk | www.estetika.sk | www.farmakologia.sk | www.filozofia.sk | Fyzika | www.futurologia.sk | www.genetika.sk | www.chemia.sk | www.lingvistika.sk | www.politologia.sk | www.psychologia.sk | www.sexuologia.sk | www.sociologia.sk | www.veda.sk I www.zoologia.sk