Sandy railway station - Biblioteka.sk

Upozornenie: Prezeranie týchto stránok je určené len pre návštevníkov nad 18 rokov!
Zásady ochrany osobných údajov.
Používaním tohto webu súhlasíte s uchovávaním cookies, ktoré slúžia na poskytovanie služieb, nastavenie reklám a analýzu návštevnosti. OK, súhlasím


Panta Rhei Doprava Zadarmo
...
...


A | B | C | D | E | F | G | H | CH | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

Sandy railway station
 ...

Sandy
National Rail
General information
LocationSandy, Central Bedfordshire
England
Grid referenceTL177487
Managed byGreat Northern
Platforms2
Tracks4
Other information
Station codeSDY
ClassificationDfT category E
History
Opened7 August 1850
Original companyGreat Northern Railway
Pre-groupingGreat Northern Railway
Post-groupingLondon and North Eastern Railway
Eastern Region of British Railways
Passengers
2018/19Decrease 0.498 million
2019/20Decrease 0.496 million
2020/21Decrease 0.143 million
2021/22Increase 0.386 million
2022/23Increase 0.524 million
Location
Map
Notes
Passenger statistics from the Office of Rail and Road

Sandy railway station serves the town of Sandy in Bedfordshire, England. It is on the East Coast Main Line, about 44 miles (71 km) from London King's Cross. Sandy is managed by Great Northern but all train services are operated by Thameslink.

Sandy station was originally built in 1850 for the Great Northern Railway; the London and North Western Railway opened an adjacent station in 1862. The stations were later merged into one, which has since undergone many changes.

The present station has two large platforms and 4 main rail lines, a pair of "up and down" slow lines used by stopping services and a pair of "up and down" fast lines used by high speed services passing through. A fifth line extends off the "up" slow line which links into the remaining sidings and original bay platforms. There is also a sixth line off the "down" slow line that links to a siding beside Platform 1.

History

December 1966

The first section of the Great Northern Railway (GNR) - that from Louth to a junction with the Manchester, Sheffield and Lincolnshire Railway at Grimsby - opened on 1 March 1848, but the southern section of the main line, between Maiden Lane and Peterborough, was not opened until August 1850. Sandy was one of the original stations, opening with the line on 7 August 1850.[1][2][3]

December 1967

The Sandy and Potton Railway was opened for goods traffic on 23 June 1857, and to passengers on 9 November 1857. It was later purchased by the Bedford and Cambridge Railway (B&CR), which closed the line in January 1862 for reconstruction. The line reopened on 7 July 1862, including a new station at Sandy separate from, but adjacent to, the GNR station. The B&CR was absorbed by the London and North Western Railway (LNWR) in 1865. The eastern section of the Bedford-Cambridge route (sometimes known as the Varsity Line) closed on 1 January 1968, and with it, the ex-LNWR platforms at Sandy.[3][4]

The two stations were physically adjacent, and shared an island platform. In 1917 the LNWR station was placed under the management of the GNR, and then shared the booking facilities. After the closure of the Varsity Line, the station was considerably rebuilt in the early 1970s to give a 4-track layout throughout, and platforms on the slow lines only, thus removing a 2-track bottleneck on the East Coast Main Line.[5]

Sandy railway station was the site of the English unjust enrichment case Great Northern Railway Co. v Swaffield (1874) LR 9 Exch 132, in which the defendant sent a horse to this railway station, to be collected. His employee arrived the next day, but the station master demanded that he pay livery stable costs for the night; the employee refused to pay, and did not collect the horse. The defendant arrived later, and demanded payment to compensate him for duress of goods (after the station master offered to pay livery stable costs out of pocket); after the station master refused to pay such compensation, the defendant left the horse in the possession of the station for four months during litigation. The Court of the Exchequer held the defendant liable for four months' stable costs, as the plaintiff in the case 'had not choice, unless they would leave the horse at the station or in the high road to his own danger and the danger of other people' (per Kelly CB). In this way the court recognised a limited exception to the rule that no claim for salvage be recognised by the courts outside the context of salvage in tidal waters. The stable costs were paid to the use of the defendant by way of necessity, and therefore constituted unjust enrichment.

Facilities