The Green Line (Line 5) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. The line consists of 24 stations covering a total length of 28.79 km. It runs between Inderlok and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station.[2]
It is almost an elevated line except for Kirti Nagar Metro Station which is At Grade and runs mostly along the busy NH 9 route in North Delhi and North West Delhi, bypassing Tikri Border to enter Bahadurgarh. It is the first Delhi metro line on standard gauge, as opposed to 5 ft 6 in (1,676 mm) broad gauge, prevalent in Red, Yellow and Blue Lines.
A 12.37 km extension of Green Line with ten stations was approved by the Union Government in March 2024. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2029.[3][4][5]
History
The line was opened in two stages, with the 15.1 km Inderlok – Mundka section opening on 3 April 2010[6] and the 3.5 km Kirti Nagar – Ashok Park Main branch line on 27 August 2011. Though its route is shorter than other lines, the Green Line serves as a lifeline for Delhiites connecting to the Red and Blue Lines, as it covers major commercial and residential areas like Punjabi Bagh, Paschim Vihar, Nangloi and Mundka.
On 6 August 2012, in a step that will improve commuting in National Capital Region, the Union government approved the extension of Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km metro stretch comprises seven stations with four of them in Delhi and the remaining three in Bahadurgarh -- Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma (Modern Industrial Estate), Bahadurgarh City (Bus Stand) and Brigadier Hoshiar Singh (City Park).[7]
Construction work of this extension began in 2013 and was completed by the second half of 2018, as part of the Phase III expansion. Prime Minister Narendra Modi inaugurated the Mundka – Bahadurgarh stretch via video conferencing on 24 June 2018.
In late October 2019, it was decided to construct steel platforms on the viaduct of Green Line between Punjabi Bagh and Shivaji Park stations that will provide a seamless interchange between Green Line and Pink Line.[8] Construction began in that year itself and the new halt platform of Green Line, named Punjabi Bagh West, was thrown open to the public on 29 March 2022, after multiple delays.[9]
The new halt platform of Green Line is connected by a Foot Over Bridge (FOB), which links with the Punjabi Bagh West station of the Pink Line. The FOB is 212 metres long. The new platforms are 155 metres in length and are connected with the FOB by two extra-large lifts on each platform with a capacity of 26 passengers each as well as staircases.[9]
Stations
Main Line
Green Line | |||||||||
---|---|---|---|---|---|---|---|---|---|
# | Station Name | Phase | Opening | Interchange Connection | Station Layout | Platform Level Type | Depot Connection | Depot Layout | |
English | Hindi | ||||||||
1 | Indraprastha | इंद्रप्रस्थ | 4 | 2029 | Blue Line | Underground | Island | Indraprastha Depot | At Grade |
2 | Delhi Sachivalaya | दिल्ली सचिवालय | 4 | 2029 | None | Underground | Island | None | None |
3 | Raj Ghat | राज घाट | 4 | 2029 | None | Underground | Island | None | None |
4 | Delhi Gate | दिल्ली गेट | 4 | 2029 | Violet Line | Underground | Island | None | None |
5 | Ramlila Maidan | रामलीला मैदान | 4 | 2029 | None | Underground | Island | None | None |
6 | New Delhi | नई दिल्ली | 4 | 2029 | Zdroj:https://en.wikipedia.org?pojem=Green_Line_(Delhi_Metro)